Chavant Photo Gallery

Selected examples of Chavant products

Most viewed
tire23.jpg
Bunt's Concept 400 Series Tire #23312 viewsThis view shows the temporary flange piece removed to allow the second section of mould to be laid up.
tire24.jpg
Bunt's Concept 400 Series Tire #24312 viewsSecond section of the mould laid up.
tire7.jpg
Bunt's Concept 400 Series Tire #07310 viewsFurther clay is added to the low spots.
tire8.jpg
Bunt's Concept 400 Series Tire #08310 viewsMore work with the template to achieve a regular surface.
tire30.jpg
Bunt's Concept 400 Series Tire #30309 viewsThe insert cured with the fixing bolts in position.
ValorCommitmentDedication.JPG
Valor Commitment Dedication308 views911 Flight Crew Memorial
http://www.911flightcrewmemorial.org/
tire5.jpg
Bunt's Concept 400 Series Tire #05306 viewsAdditional clay added to build up the form.
tire25.jpg
Bunt's Concept 400 Series Tire #25301 viewsThe mould cured, trimmed and the side bolt holes jig-drilled for later use on the final mould sections.
tire27.jpg
Bunt's Concept 400 Series Tire #27301 viewsThe clay model is now prepared for the next section which incorporates the sidewall lettering. This raised lettering (2mm) was cut and bonded to the sidewall area. The sidewall plates were replaced and another lay-up carried out.
tire26.jpg
Bunt's Concept 400 Series Tire #26297 viewsThe mould partially stripped, with the main section left in place so that additional sidewall sections can be laid-up. The sidewall section shown here has a plain surface.
tire28.jpg
Bunt's Concept 400 Series Tire #28296 viewsAfter a further moulding was completed with the tire size featured, this was the basic mould from which the final model would be produced.
tire29.jpg
Bunt's Concept 400 Series Tire #29289 viewsIt was decided to incorporate some silicon change pieces in the final model so that there would not be any problems with the lettering. This image shows the fixing bolts for the silicon insert jigged into position before the silicon is poured.
281 files on 24 page(s) 20